Products

CLMP750 Planetary Mixer

The CLMP750 vertical shaft planetary concrete mixer features a 750L single discharge capacity and 1800kg discharge weight. It delivers a productivity of 30-35m³/h with 42.7kw rated power and a 25r/min reducer rotation speed. It completes high-uniformity mixing in 60 seconds. Multiple voltage options are fully customizable. Ideal for high-quality concrete mixing and widely used in construction, prefabrication, ceramics and refractory industries.

CLMP750 Planetary Mixer
CLMP750 Planetary Mixer
CLMP750 Planetary Mixer
CLMP750 Planetary Mixer
CLMP750 Planetary Mixer

Main Features

Mixing-System

Mixing System

Discharging-System

Discharging System

Observation-Port

Observation Port

Transmission

Transmission

Injector

Injector

360°-Mixing-Without-Dead-Angle

360° Mixing Without Dead Angle

Technical Parameters

Model

CLMP750

Discharge Capacity

750L

Charge Capacity

1125L

Discharge Quality

1800kg

Mixing Arm

5pcs

Hydraulic Discharge Power

2.2kw

Mixing Motor Power

30kw

Lifting Motor Power

7.5kw

Water Pump Motor

3kw

Reducer rotation

16r/min

Revolving of reducer

25r/min

Total Weight

3900kg

Overall Dimension

2580*2340*2195mm

youshi-1

Supplying to 80+ countries worldwide

youshi-2

20,000㎡ modernized factory

youshi

Stable, reliable & extended service life

youshi-4

Global installation and O&M training

Perfect Full-tracing Service

pic-1
pic-2
pic-3
pic-4
pic-5
pic-6
pic-7
pic-9
pic-10
pic-12
pic-13
pic-14

Application Areas

Housing and construction projects

Housing and construction projects

Mainly include residences, office buildings, shopping malls and factories. They are mostly located in urban or suburban areas with relatively compact sites and tight construction schedules. High requirements are placed on concrete workability and pouring performance to meet the structural needs of different strength grades.
Municipal roads, squares and pipeline networks

Municipal roads, squares and pipeline networks

These projects are mostly constructed in urban areas with heavy traffic interference. Construction is usually carried out in sections and at a fast pace. Concrete is required to have early strength, wear resistance and crack resistance to resume traffic quickly and ensure long-term stability.
Highway projects

Highway projects

They have long routes and large spans, mostly constructed in field environments with complex climate and geological conditions and long transportation distances. Concrete is required to have good stability, fatigue resistance, freeze-thaw resistance and impermeability for large-area continuous construction and long-term heavy load use.
Bridge projects

Bridge projects

These projects are mostly over water, at high altitudes or crossing traffic lines, significantly affected by wind, temperature difference, water flow and heavy loads. Construction conditions are complex. Concrete is required to be high-strength, high-flowability, corrosion-resistant and chloride-ion penetration resistant.

Related Products

Send Message

      Copyright © 2026 Zhucheng Machinery Co., Ltd.

      Home WhatsApp Mail Inquiry