The JS500 is a high-efficiency double-horizontal-shaft forced concrete mixer. It delivers a 500L compacted concrete output per batch with an hourly productivity of 30 cubic meters. Powered by a 18.5kw motor, it finishes mixing in just 30 seconds and features a 35m/min hoist lifting speed. Multiple voltage options including 380V, 220V and 440V are available for customization, ensuring strong adaptability for various construction scenarios.









|
Model |
JS500 |
|
Capacity |
30m³/h |
|
Discharge Volume |
500L |
|
Charge Volume |
800L |
|
Loading type |
Skip Hoist |
|
Mixing blade speed |
30r/min |
|
Mixer motor power |
18.5kw |
|
Hoist Power |
5.5kw |
|
Water Pump Power |
0.75kw |
|
Overall weight |
4070kg |
|
Overall dimension |
2900*2150*2580mm |




We offer professional pre-sales consulting support to fully understand customer needs. We optimize equipment configuration plans, provide reliable data and solutions for decision-making, and deliver customized R&D and production.
We provide complete sales solution support for customers. We carry out detailed concrete mixing plant site planning and select the most reasonable installation plan based on site conditions and project requirements.
We provide all-round after-sales support including 24h online technical support, professional operation training, telephone and remote service, on-site maintenance, as well as equipment upgrade and relocation.
We provide reliable warranty service: one-year warranty for the whole machine, two-year warranty for core components, and free replacement for some wearing parts within the warranty period.












Housing and construction projects
Mainly include residences, office buildings, shopping malls and factories. They are mostly located in urban or suburban areas with relatively compact sites and tight construction schedules. High requirements are placed on concrete workability and pouring performance to meet the structural needs of different strength grades.
Municipal roads, squares and pipeline networks
These projects are mostly constructed in urban areas with heavy traffic interference. Construction is usually carried out in sections and at a fast pace. Concrete is required to have early strength, wear resistance and crack resistance to resume traffic quickly and ensure long-term stability.
Highway projects
They have long routes and large spans, mostly constructed in field environments with complex climate and geological conditions and long transportation distances. Concrete is required to have good stability, fatigue resistance, freeze-thaw resistance and impermeability for large-area continuous construction and long-term heavy load use.
Bridge projects
These projects are mostly over water, at high altitudes or crossing traffic lines, significantly affected by wind, temperature difference, water flow and heavy loads. Construction conditions are complex. Concrete is required to be high-strength, high-flowability, corrosion-resistant and chloride-ion penetration resistant.